DEYE PCS · BATTERY STORAGE · OPTIONAL SOLAR INPUT

A PCS bundle built around your project.

Start with a 100 kW or 125 kW power conversion system and BOS-B Pro battery storage. Add MPPT and STS modules to suit the agreed system configuration.

Equipment supply only. Pricing, availability, exact battery revision and compatibility are confirmed on quotation. Installation and collection are arranged separately.

Deye manufacturer illustration of MPPT and PCS modules
Manufacturer illustration. Module quantities and included equipment depend on your quotation.
UNDERSTAND THE EQUIPMENT

Four parts to discuss in your enquiry

PCS: 100 kW or 125 kW

Converts power between the battery’s DC side and the AC system. Specify your required power and intended on-grid or off-grid operation.

BOS-B Pro battery storage

Battery quantity and capacity are selected for the proposed system. The published figures below refer specifically to BOS-B Pro-A3.

MPPT: solar input option

The separate MPPT module handles PV input. Ask for it when solar panels form part of your PCS project.

STS: switching option

The SUN-STS500L handles grid, load and generator power paths in supported configurations. Its inclusion depends on your required switching arrangement.

MANUFACTURER PARAMETERS

Compare the PCS modules

Specification baseline: Deye’s June 2026 solution brochure. Source links accompany each table.

PCS specifications — brochure page 5
Parameter100 kW PCS125 kW PCS
ModelSUN-100K-PCS01HP3SUN-125K-PCS01HP3
Rated AC active power100 kW125 kW
Maximum AC apparent power110 kVA125 kVA
Battery voltage range630–1000 V630–1000 V
Maximum battery charge / discharge current175 A / 175 A200 A / 200 A
Maximum efficiency98.5%98.5%
PCS module ingress protectionIP65IP65
Continuous off-grid load: 70% guidanceUp to 70 kWUp to 87.5 kW

Read the PCS datasheet (PDF) ↗

The 70% row is calculated from the brochure’s off-grid guidance. IP65 applies to the PCS module; it does not describe the complete battery and STS installation.

Solar input: the MPPT module

MPPT specifications — brochure page 4
ModelSUN-MPPT-L01-EU-AM8
Maximum PV access power200 kW
Maximum PV input power160 kW
MPPT trackers8
Maximum operating current per tracker40 A
Maximum short-circuit current per tracker60 A
Maximum PV input voltage800 V
Start-up voltage200 V
MPPT voltage range180–750 V
Full-load MPPT voltage range450–750 V
DC output voltage / maximum current630–1000 V / 200 A
MPPT module ingress protectionIP65

Read the MPPT datasheet (PDF) ↗

BOS-B PRO-A3 BATTERY REVISION

Battery configuration matters

The brochure lists 16.08 kWh nominal energy per module. Its maximum 16-module system is listed at 257.23 kWh nominal and 231.51 kWh usable energy. These are published system figures, not a fixed bundle size or a backup-duration promise.

Although the battery family lists 5–16 modules in series, the PCS matching rules are narrower:

Manufacturer matching modes — brochure page 6
EquipmentOperating modeModules in seriesMPPT open-circuit voltage limit
PCS without MPPTOn-grid14–16Not applicable
PCS without MPPTOff-grid15–16Not applicable
PCS + MPPTOn-grid or off-grid16≤800 V
PCS + MPPTOn-grid or off-grid15≤750 V
PCS + MPPTOn-grid only14≤700 V

Read the battery and matching table (PDF) ↗

These limits do not replace a system design. PV voltage must be assessed for the site conditions. BOS-B Pro-A3 is rated IP20; do not assume the PCS module’s IP65 rating applies to the battery system or to other BOS-B Pro revisions.

Switching with SUN-STS500L

  • Grid, load and generator paths are each rated for 500 kW.
  • The brochure states an on-grid/off-grid switching time below 10 ms.
  • One STS supports five 100 kW PCS units or four 125 kW PCS units.
  • The brochure allows up to five STS modules in parallel, subject to the supported system topology.
  • The STS module is rated IP20.

Parallel capacity depends on the connection mode. The January manual states a 700 kW off-grid load limit for STS parallel “Load” mode (printed page 80 / PDF page 82). Parallel capability is not a promise that every topology supports the same off-grid load.

STS overview (PDF) ↗ · Manual: STS settings (PDF) ↗

Manufacturer illustration of SUN-STS500L showing grid, load and generator ports
Manufacturer STS illustration. Switching arrangements and module quantities are confirmed for the proposed project.

Documents for your project team

Use the documentation for the exact supplied revision. The documents differ in some specifications; the quotation should identify the proposed models and applicable documentation.

YOUR NEXT STEP

Tell us what your PCS project needs.

Include your location, 100 kW or 125 kW preference, on-grid or off-grid requirements, continuous and starting loads, required battery capacity or backup duration, solar input needs and timeframe. “Please advise” is welcome.

Your quote page will select the PCS range. Exact models, quantities, accessories, pricing and availability are confirmed before ordering.